Portfolio grouped by category with featured showcase cards and archive history.
Colorado Springs, Colorado
Three-phase central plant upgrade including combustion controls modernization, generator replacement, flue gas economizers, and distribution pump replacement. Project achieved 85% efficiency with advanced process controls and energy management.
View Project →USAFA, Colorado
Complete replacement of East and West cooling towers serving the Fairchild Hall chilled water plant, with CTI-certified towers, stainless basins, variable-frequency fan drives, and parallel-cell turndown.
View Project →Grand Junction, Colorado
Design-build replacement of a bulk liquid oxygen system for the VA hospital, including primary and reserve tanks, vaporizers, pressure regulation, and telemetry monitoring integrated with the building automation system.
View Project →Fort Carson, Colorado
26,000 SF vehicle maintenance facility mechanical systems upgrade featuring six-air-change ventilation for vehicle maintenance bays and specialized exhaust systems for heavy artillery equipment.
View Project →Colorado Springs, Colorado
Major central plant upgrade for US Air Force Academy featuring burner replacements, flue gas economizers, and microprocessor-based combustion controls. Advanced process control integration with $6 million construction investment.
View Project →Colorado Springs, Colorado
Chiller plant replacement at US Air Force Academy replacing two 550-ton absorption chillers with three 550-ton centrifugal units. Featured flat plate heat exchanger for free cooling and primary/secondary pumping conversion.
View Project →Colorado Springs, Colorado
2,800 LF Class A conduit HTHW distribution system replacement serving three Falcon Club area buildings. Project navigated high-traffic areas with street and driveway crossings including asbestos abatement.
View Project →Colorado Springs, Colorado
4,000 ft HTHW distribution system replacement from central heating plant to hospital featuring 6" carrier pipes and sophisticated routing across rough terrain with 130 ft elevation changes.
View Project →Colorado Springs, Colorado
45,000 SF office building HVAC system complete replacement featuring dual-compressor variable capacity control and high-efficiency heating water boilers. Two-phase renovation with integrated building automation.
View Project →Colorado Springs, Colorado
UFC-compliant Large Vehicle Search Facility for inspection of semi tractor/trailers at the main gate, featuring inspection pit, CCTV systems, driver waiting area, and armed overwatch position.
View Project →USAFA, Colorado
New VIP spectator area between Clune Arena and Hockey Arena inside the Cadet Field House, featuring kitchen, bar, restrooms, video control room, and complete new HVAC and electrical services.
View Project →USAFA, Colorado
Second and third phases of comprehensive renovation of the 228,550 SF Cadet Field House including mechanical rooms, locker rooms, ice arena upgrades, 200m hydraulic track replacement, and building envelope improvements.
View Project →USAFA, Colorado
Upgrade of simulator labs in Fairchild Hall for the Department of Military and Strategic Studies, supporting 1,000+ cadets annually with 17 tactical flight simulators, 4 RPA simulators, and 24 CAOC stations.
View Project →Fort Carson, Colorado
Replacement of 55-MMBTU high temperature hot water generator with dual-fuel capability, flue gas economizer achieving 85% efficiency, PLC microprocessor controls, and HMI touchscreen interfaces.
View Project →USAFA, Colorado
Replacement of over 90 HTHW isolation valves throughout USAFA utility tunnels, upgrading from Class 300/600 cast steel gate valves to Triple Offset Rotary valves rated for 454 degrees F at 450 PSI.
View Project →USAFA, Colorado
FSRM charrette and renovation design for McDermott Library within Fairchild Hall, including interior reconfiguration, MEP upgrades, and integration of Academic Success Center and Scholar's Program.
View Project →Colorado Springs, Colorado
Multi-phase Design-Build visitor center through public-private partnership, a three-level iconic facility with exhibit infrastructure, advanced security, and construction type reclassification.
View Project →USAFA, Colorado
Asbestos abatement and replacement of 15,000 linear feet of HTHW pipe insulation in utility tunnels operating at 375-400 degrees F, using Pyrogel XTE aerogel blanket insulation (NASA technology).
View Project →Longmont, Colorado
60,000 SF military maintenance facility HVAC upgrade serving vehicle, electronics, welding, and woodworking operations. Project addressed unique ventilation requirements and obtained code waiver for high-bay areas.
View Project →Longmont, Colorado
Engine testing dynamometer facility supporting up to 1,000 HP testing. Project featured specialized acoustic design with sand-filled block walls, high-temperature exhaust systems, and computerized data acquisition.
View Project →Ordway, Colorado
Replacement of aging underground natural gas distribution system at Arkansas Valley Correctional Facility with new polyethylene piping, valves, and infrastructure to support building operations.
View Project →Canon City, Colorado
Multiple high-pressure steam boiler plant replacements at Fremont Correctional Facility including B-3 pony boiler (2017) and B-1 boiler (2020) with dual-fuel capability, PLC controls, and flue-economizers.
View Project →Pueblo, Colorado
HVAC system improvements at San Carlos Correctional Facility including replacement of rotary screw chillers with centrifugal units featuring oil-free magnetic bearing technology, and cooling tower upgrades.
View Project →Colorado Springs, Colorado
Replacement of two cooling towers within a crisis command center building, each dedicated to a Multistack modular chiller with emergency change-over redundancy and phased installation.
View Project →Limon, Colorado
Replacement of hail-damaged rooftop mechanical equipment including approximately 132 fans with direct drive EC motors, 16 rain caps, condensing units, and roof ventilators.
View Project →Sterling, Colorado
New $35M kitchen design serving 2,500 offenders three times daily with chilled water HVAC, campus steam conversion, custom air handling units, and LEED-certified design.
View Project →Sterling, Colorado
Design of new 2-mile steam and condensate piping distribution system with 28 valve vaults for Colorado's largest state prison, serving 26 buildings and 7,500 meals daily.
View Project →Sterling, Colorado
Replacement of high-pressure steam system deaerator with minimal outages using temporary docking station, plus upgrade to variable speed feedwater pumps with PLC controls.
View Project →Colorado Springs, Colorado
Replacement of a 40 MMBtuH High Temperature Hot Water Generator with a 34 MMBtuH unit, including flue gas economizer and advanced combustion control systems. This upgrade improved generator efficiency from 80% to 85% and modernized the central plant infrastructure.
View Project →Colorado Springs, Colorado
Master planning and expansion of the central chilled water plant from the initial capacity to 1,400 tons, including a new 900-ton chiller and innovative concrete cooling tower structure. The project addressed CFC refrigerant phase-out and limited expansion space while maintaining campus cooling requirements.
View Project →Colorado Springs, Colorado
Comprehensive analysis comparing thermal storage and conventional chiller options for campus cooling expansion. The study evaluated capital costs, operating expenses, and lifecycle costs, ultimately recommending a centrifugal chiller with primary/secondary pumping conversion.
View Project →Colorado Springs, Colorado
Complete renovation of an 80,000 SF college dormitory featuring innovative energy recovery ventilation systems, efficient hydronic heating/cooling distribution, and advanced building automation. The project achieved excellent commissioning results and high occupant satisfaction.
View Project →Colorado Springs, Colorado
Multi-phase upgrade of the campus High Temperature Hot Water distribution system including system study, main piping improvements, and new distribution to serve six new buildings. The project improved system reliability and peak flow conditions.
View Project →Colorado Springs, Colorado
Replacement of a 20 MMBtuH boiler with a 40 MMBtuH unit featuring advanced microprocessor-based combustion and burner management systems. The project included significant piping modifications and a building addition to accommodate the larger boiler.
View Project →Colorado Springs, Colorado
Heat recovery economizer system designed to capture waste heat from HTHW generators for pool heating and domestic hot water preheating at El Pomar Sports Center. The system features stainless steel construction and advanced microprocessor-based controls integrated with campus building automation.
View Project →Denver, Colorado
Campus-wide study and replacement of critical steam and chilled water distribution piping. Project involved sophisticated hydraulic analysis to solve chilled water flow problems and included pre-cast concrete valve vaults.
View Project →Greeley, Colorado
Major HTHW piping installation in campus tunnel system coordinated with $20 million renovation project. Project required approximately 8,000 LF of 10" piping with multi-phase construction to maintain building services.
View Project →Louisville, Colorado
Central heating and cooling plant with campus distribution system designed for primary/secondary pumping operation. Project included innovative pre-insulated piping systems and HDPE chilled water distribution.
View Project →Colorado Springs, Colorado
10,000 SF classroom space renovation featuring advanced VAV system with heat recovery wheel and dry-bulb economizer. Integrated steam-to-hot-water heat exchange for zone-controlled heating and cooling.
View Project →Colorado Springs, Colorado
Basement boiler replacement in space-constrained area featuring two cast iron boilers and forced draft burners. Project included new flue stack extending three stories and microprocessor-based building automation integration.
View Project →Pueblo, Colorado
Investment Grade energy audit-driven Energy Performance Contracting for 10+ campus facilities, including 18 boiler replacements, chiller upgrades with magnetic bearings, 1 MW battery storage, and a 23-acre solar array achieving net-zero.
View Project →Colorado Springs, Colorado
Back-up power generation systems for critical computer rooms featuring three 1.1MW diesel generators with integrated cooling and fuel systems. The project included UPS backup systems and comprehensive building automation integration.
View Project →Colorado Springs, Colorado
Conversion of a 150,000 SF warehouse space to two-story office space in a fast-track project. Featured innovative mechanical systems with custom VAV units and relocated DirecTv computer room without service interruption.
View Project →Colorado Springs, Colorado
Three new computer lab facilities with CRAC units and comprehensive mechanical systems supporting testing and design operations. Project integrated front and overhead supply distributions with VAV office systems.
View Project →Colorado Springs, Colorado
15,000 SF office space with modular air handling system and comprehensive VAV distribution. The project featured innovative mechanical room design and dedicated cooling for communications space.
View Project →Colorado Springs, Colorado
World-class computer room facility with nine 30-ton CRAC units and comprehensive training infrastructure. Featured specialized cooling systems and integrated building automation for high-performance computing environment.
View Project →Colorado Springs, Colorado
Dual clean room process exhaust systems designed for Class 100 clean rooms serving semiconductor manufacturing. Project included redundant exhaust fans and future expansion capacity planning.
View Project →Fort Collins, Colorado
Chilled water plant expansion from 2,450 to 3,450 tons supporting data centers and office space. Featured two 900-ton chillers with VFDs, innovative plate and frame heat exchanger in sidecar application, and comprehensive hydraulic analysis.
View Project →Colorado Springs, Colorado
Major chiller plant upgrade from three 550-ton to three 750-ton chillers maintaining critical data center cooling. Featured high-efficiency equipment selection, no increase in electrical load, and comprehensive building automation upgrades.
View Project →Fountain, Colorado
State-of-the-art quality control testing facility with two burn rooms maintaining extreme conditions at 125F plus/minus 3F. Featured independent HASS testing enclosures and specialized temperature control systems.
View Project →Fountain, Colorado
Comprehensive ventilation study and upgrade for 360,000 SF facility including indirect fired make-up air systems and pressure-independent exhaust systems. Project served SMT ovens, wave machines, and specialized manufacturing equipment.
View Project →Dillon, Colorado
12,600 SF church addition featuring worship area with 500-seat capacity and comprehensive educational facilities. Project included innovative heating systems with CO2-based ventilation optimization and high-efficiency boilers.
View Project →Palmer Lake, Colorado
28,500 SF extended-stay conference center with 28 guest rooms, dining facilities, recreation areas, and day care. Featured diverse HVAC systems including PTAC units, VAV boxes, and specialized kitchen exhaust systems.
View Project →