Portfolio grouped by category with featured showcase cards and archive history.
Colorado Springs, Colorado
Three-phase central plant upgrade including combustion controls modernization, generator replacement, flue gas economizers, and distribution pump replacement. Project achieved 85% efficiency with advanced process controls and energy management.
View Project →USAFA, Colorado
Complete replacement of East and West cooling towers serving the Fairchild Hall chilled water plant, with CTI-certified towers, stainless basins, variable-frequency fan drives, and parallel-cell turndown.
View Project →Grand Junction, Colorado
Design-build replacement of a bulk liquid oxygen system for the VA hospital, including primary and reserve tanks, vaporizers, pressure regulation, and telemetry monitoring integrated with the building automation system.
View Project →Fort Carson, Colorado
26,000 SF vehicle maintenance facility mechanical systems upgrade featuring six-air-change ventilation for vehicle maintenance bays and specialized exhaust systems for heavy artillery equipment.
View Project →Colorado Springs, Colorado
Major central plant upgrade for US Air Force Academy featuring burner replacements, flue gas economizers, and microprocessor-based combustion controls. Advanced process control integration with $6 million construction investment.
View Project →Colorado Springs, Colorado
Chiller plant replacement at US Air Force Academy replacing two 550-ton absorption chillers with three 550-ton centrifugal units. Featured flat plate heat exchanger for free cooling and primary/secondary pumping conversion.
View Project →Colorado Springs, Colorado
2,800 LF Class A conduit HTHW distribution system replacement serving three Falcon Club area buildings. Project navigated high-traffic areas with street and driveway crossings including asbestos abatement.
View Project →Colorado Springs, Colorado
4,000 ft HTHW distribution system replacement from central heating plant to hospital featuring 6" carrier pipes and sophisticated routing across rough terrain with 130 ft elevation changes.
View Project →Colorado Springs, Colorado
45,000 SF office building HVAC system complete replacement featuring dual-compressor variable capacity control and high-efficiency heating water boilers. Two-phase renovation with integrated building automation.
View Project →Colorado Springs, Colorado
UFC-compliant Large Vehicle Search Facility for inspection of semi tractor/trailers at the main gate, featuring inspection pit, CCTV systems, driver waiting area, and armed overwatch position.
View Project →USAFA, Colorado
New VIP spectator area between Clune Arena and Hockey Arena inside the Cadet Field House, featuring kitchen, bar, restrooms, video control room, and complete new HVAC and electrical services.
View Project →USAFA, Colorado
Second and third phases of comprehensive renovation of the 228,550 SF Cadet Field House including mechanical rooms, locker rooms, ice arena upgrades, 200m hydraulic track replacement, and building envelope improvements.
View Project →USAFA, Colorado
Upgrade of simulator labs in Fairchild Hall for the Department of Military and Strategic Studies, supporting 1,000+ cadets annually with 17 tactical flight simulators, 4 RPA simulators, and 24 CAOC stations.
View Project →Fort Carson, Colorado
Replacement of 55-MMBTU high temperature hot water generator with dual-fuel capability, flue gas economizer achieving 85% efficiency, PLC microprocessor controls, and HMI touchscreen interfaces.
View Project →USAFA, Colorado
Replacement of over 90 HTHW isolation valves throughout USAFA utility tunnels, upgrading from Class 300/600 cast steel gate valves to Triple Offset Rotary valves rated for 454 degrees F at 450 PSI.
View Project →USAFA, Colorado
FSRM charrette and renovation design for McDermott Library within Fairchild Hall, including interior reconfiguration, MEP upgrades, and integration of Academic Success Center and Scholar's Program.
View Project →Colorado Springs, Colorado
Multi-phase Design-Build visitor center through public-private partnership, a three-level iconic facility with exhibit infrastructure, advanced security, and construction type reclassification.
View Project →USAFA, Colorado
Asbestos abatement and replacement of 15,000 linear feet of HTHW pipe insulation in utility tunnels operating at 375-400 degrees F, using Pyrogel XTE aerogel blanket insulation (NASA technology).
View Project →