Schendt Engineering Corp. was the prime design consultant for this project. The plant has one 50MMBtuH generator (G-1) and three 100MMBtuH generators (G-2, 3, & 4). The plant HTHW distribution system is a primary/secondary pumping system. The primary focus of the project included replacement of the burners on the HTHW generators No. 3 & 4, and replacement of the combustion controls and burner management systems throughout the plant. The project also included replacement of the forced draft combustion air fans on generators No. 3 & 4, installation of a flue gas economizer on generator No. 1, re-piping of the existing flue gas economizers on generators No. 3 & 4, replacement of the make-up water pumps, installation of a new seal flush cooling system for all of the HTHW pumps, replacement of the variable frequency drives for fans and pumps, and converting the plant steam cushion expansion tank to a nitrogen cushion.