Colorado Springs, Colorado
Replacement of a 40 MMBtuH High Temperature Hot Water Generator with a 34 MMBtuH unit, including flue gas economizer and advanced combustion control systems. This upgrade improved generator efficiency from 80% to 85% and modernized the central plant infrastructure.
View Project →Colorado Springs, Colorado
Master planning and expansion of the central chilled water plant from the initial capacity to 1,400 tons, including a new 900-ton chiller and innovative concrete cooling tower structure. The project addressed CFC refrigerant phase-out and limited expansion space while maintaining campus cooling requirements.
View Project →Colorado Springs, Colorado
Comprehensive analysis comparing thermal storage and conventional chiller options for campus cooling expansion. The study evaluated capital costs, operating expenses, and lifecycle costs, ultimately recommending a centrifugal chiller with primary/secondary pumping conversion.
View Project →Colorado Springs, Colorado
Complete renovation of an 80,000 SF college dormitory featuring innovative energy recovery ventilation systems, efficient hydronic heating/cooling distribution, and advanced building automation. The project achieved excellent commissioning results and high occupant satisfaction.
View Project →Colorado Springs, Colorado
Multi-phase upgrade of the campus High Temperature Hot Water distribution system including system study, main piping improvements, and new distribution to serve six new buildings. The project improved system reliability and peak flow conditions.
View Project →Colorado Springs, Colorado
Replacement of a 20 MMBtuH boiler with a 40 MMBtuH unit featuring advanced microprocessor-based combustion and burner management systems. The project included significant piping modifications and a building addition to accommodate the larger boiler.
View Project →Colorado Springs, Colorado
Heat recovery economizer system designed to capture waste heat from HTHW generators for pool heating and domestic hot water preheating at El Pomar Sports Center. The system features stainless steel construction and advanced microprocessor-based controls integrated with campus building automation.
View Project →Denver, Colorado
Campus-wide study and replacement of critical steam and chilled water distribution piping. Project involved sophisticated hydraulic analysis to solve chilled water flow problems and included pre-cast concrete valve vaults.
View Project →Greeley, Colorado
Major HTHW piping installation in campus tunnel system coordinated with $20 million renovation project. Project required approximately 8,000 LF of 10" piping with multi-phase construction to maintain building services.
View Project →Louisville, Colorado
Central heating and cooling plant with campus distribution system designed for primary/secondary pumping operation. Project included innovative pre-insulated piping systems and HDPE chilled water distribution.
View Project →Colorado Springs, Colorado
10,000 SF classroom space renovation featuring advanced VAV system with heat recovery wheel and dry-bulb economizer. Integrated steam-to-hot-water heat exchange for zone-controlled heating and cooling.
View Project →Colorado Springs, Colorado
Basement boiler replacement in space-constrained area featuring two cast iron boilers and forced draft burners. Project included new flue stack extending three stories and microprocessor-based building automation integration.
View Project →Pueblo, Colorado
Investment Grade energy audit-driven Energy Performance Contracting for 10+ campus facilities, including 18 boiler replacements, chiller upgrades with magnetic bearings, 1 MW battery storage, and a 23-acre solar array achieving net-zero.
View Project →