Schendt Engineering Corp. Staff had 18 years of history working at this site, having renovated nearly all of the 500,000 SF of space within the facility and as-built all existing hydronic systems. The initial project stage involved a comprehensive hydraulic analysis of the chilled water plant and distribution systems. As-built drawings were compiled from previous projects, equipment schedules were developed, and peak connected loads were estimated. A hydraulic model of the chilled water system was developed to analyze various scenarios against historical data, revealing that the facility lacked adequate firm plant capacity to handle current and future peak cooling loads.