The project provided master planning to increase the central plant capacity to 2,400 tons. The current construction project increased the central plant capacity to 1,400 tons and included installation of one new 900 ton chiller, a three cell 2,400 ton concrete cooling tower, three new condenser water pumps, three new chilled water pumps, a flat plate heat exchanger, a centrifugal separator and a combination air/dirt separator. The chilled water distribution system was converted from a primary pumped system to a primary/secondary pumped system. The design also required relocation of the existing electrical room to properly coordinate new and future equipment space requirements.