(719) 637-8850 sec@secengr.com

UCCS Dwire Hall Boiler Replacement

Dwire Hall Boiler Replacement Univerisity of Colorado at Colorado Springs Schendt Engineering was the prime consultant for this project which involved design to replace a 4,184MBH output boiler with two (2) new boilers each with a capacity of 2,133MBH output. The...

SCI Systems Process Exhaust and Ventilation Upgrade

Process Exhaust and Ventilation Upgrade SCI Systems, Inc., Fountain, Colorado SCI Systems, Inc. is a manufacturer and assembler of computer components for several leading PC manufacturers. Component manufacturing includes motherboards, graphics cards, modems, Ethernet...

SCI Systems Component Testing Lab

Component Testing Lab SCI Systems, Inc., Foundain, Colorado SCI Systems, Inc. is a manufacturer and assembler of computer components for several leading PC manufacturers. Component manufacturing includes motherboards, graphics cards, modems, Ethernet cards, etc. as...

Pikes Peak Community College Downtown Studio

Pikes Peak Community College Downtown Studio Project involved the renovation of approximately 10,000 S.F. of classroom space. The existing mechanical systems were beyond their useful life, and could not meet current code requirements for ventilation. The new...
(719) 637-8850