by admin | Nov 19, 2015 | Uncategorized
High Temperature Hot Water (HTHW) Distribution System University of Northern Colorado, Greeley, CO We prepared a project cost estimates to install HTHW piping in the tunnel and abandon the existing direct bury system. This estimate was prepared in August 1996 and...
by admin | Nov 19, 2015 | Uncategorized
Dwire Hall Boiler Replacement Univerisity of Colorado at Colorado Springs Schendt Engineering was the prime consultant for this project which involved design to replace a 4,184MBH output boiler with two (2) new boilers each with a capacity of 2,133MBH output. The...
by admin | Nov 19, 2015 | Uncategorized
Process Exhaust and Ventilation Upgrade SCI Systems, Inc., Fountain, Colorado SCI Systems, Inc. is a manufacturer and assembler of computer components for several leading PC manufacturers. Component manufacturing includes motherboards, graphics cards, modems, Ethernet...
by admin | Nov 19, 2015 | Uncategorized
Component Testing Lab SCI Systems, Inc., Foundain, Colorado SCI Systems, Inc. is a manufacturer and assembler of computer components for several leading PC manufacturers. Component manufacturing includes motherboards, graphics cards, modems, Ethernet cards, etc. as...
by admin | Nov 19, 2015 | Uncategorized
Pikes Peak Community College Downtown Studio Project involved the renovation of approximately 10,000 S.F. of classroom space. The existing mechanical systems were beyond their useful life, and could not meet current code requirements for ventilation. The new...