by admin | Dec 2, 2015 | Uncategorized
VA Building 248 HVAC Rooftop Unit Replacement This project involved a two phase design for renovation of an approximately 45,000 S.F. office building. This renovation included a complete upgrading the HVAC systems to include a rooftop air handling unit, boilers,...
by admin | Dec 2, 2015 | Uncategorized
VA Grand Junction Liquid Oxygen Tank Replacement Schendt Engineering Corp. and Hawk Contracting worked together under a design-build contract to construct a new bulk liquid oxygen system to replace the existing system for the hospital. The existing system consisted of...
by admin | Dec 2, 2015 | Uncategorized
Replace Steam and Chilled Water Distribution System Denver University The first phase of the project involved a study of the entire campus Steam and Condensate distribution system and Chilled Water distribution system. The study involved developing equipment schedules...
by admin | Dec 2, 2015 | Uncategorized
Replace HTHW Distribution in the Falcon Club Area US Air Force Academy Schendt Engineering Corp. was the prime consultant for this project. The project generally involved replacement of the HTHW distribution system serving three (3) buildings in the Falcon Club area...
by admin | Dec 2, 2015 | Uncategorized
Replace HTHW From Heat Plant No. 1 to Pinion Drive US Air Force Academy Schendt Engineering Corp. was the prime consultant for this project. The project generally involved replacement of the HTHW distribution system from the Central Heating Plant to the hospital. The...
by admin | Dec 2, 2015 | Uncategorized
Central High Temperature Hot Water Plant Upgrade US Air Force Academy Schendt Engineering Corp. was the prime design consultant for this project. The plant has one 50MMBtuH generator (G-1) and three 100MMBtuH generators (G-2, 3, & 4). The plant HTHW distribution...