by admin | Dec 2, 2015 | Uncategorized
Lewis Palmer School District Admin Building Renovation Project generally involved renovation of a historic school building to serve as the school district administration building. This facility consisted of approximately 20,000SF of floor space on three levels. The...
by admin | Dec 2, 2015 | Uncategorized
HP Chilled Water Plant Expansion SEC was the prime design consultant on this project. This project consisted of expansion of the existing chilled water plant and construction of a new heating plant due to the split of Hewlett Packard into two companies and the need...
by admin | Dec 2, 2015 | Uncategorized
HP Central Chiller Plant Expansion Schendt Engineering Corp. Staff has a 18 year history working at this site. During this time period, we have renovated nearly all of the 500,000SF of space within this facility. During this tenure, we had as-built all of the existing...
by admin | Dec 2, 2015 | Uncategorized
Fort Carson Central High Temperature Hot Water Plant Upgrade The project involved a three (3) phased approach to upgrading the central HTHW heating plant. The first phase of the project involved a study to access the condition of the HTHW Generators and auxiliary...
by admin | Dec 2, 2015 | Uncategorized
Colorado College Slocum Hall Renovation The project involved the complete renovation of an 80,000SF college dormitory. SEC proposed an innovative ventilation design to maximize comfort and energy conservation. The International Mechanical Code still allows the use of...
by admin | Dec 2, 2015 | Uncategorized
Direct Contact Flue Gas Economizer Schendt Engineering Corp. was the prime consultant for this project with Structural, and Electrical sub-consultants to provided full design services. The first phase of the project involved performing a feasibility study to determine...