by admin | Dec 2, 2015 | Uncategorized
Central High Temperature Hot Water Plant Upgrade US Air Force Academy Schendt Engineering Corp. was the prime design consultant for this project. The plant has one 50MMBtuH generator (G-1) and three 100MMBtuH generators (G-2, 3, & 4). The plant HTHW distribution...
by admin | Dec 2, 2015 | Uncategorized
Lewis Palmer School District Admin Building Renovation Project generally involved renovation of a historic school building to serve as the school district administration building. This facility consisted of approximately 20,000SF of floor space on three levels. The...
by admin | Dec 2, 2015 | Uncategorized
HP Chilled Water Plant Expansion SEC was the prime design consultant on this project. This project consisted of expansion of the existing chilled water plant and construction of a new heating plant due to the split of Hewlett Packard into two companies and the need...
by admin | Dec 2, 2015 | Uncategorized
HP Central Chiller Plant Expansion Schendt Engineering Corp. Staff has a 18 year history working at this site. During this time period, we have renovated nearly all of the 500,000SF of space within this facility. During this tenure, we had as-built all of the existing...
by admin | Dec 2, 2015 | Uncategorized
Fort Carson Central High Temperature Hot Water Plant Upgrade The project involved a three (3) phased approach to upgrading the central HTHW heating plant. The first phase of the project involved a study to access the condition of the HTHW Generators and auxiliary...