(719) 637-8850 sec@secengr.com

US Air Force Academy Central HTHW Plant Upgrade

Central High Temperature Hot Water Plant Upgrade US Air Force Academy Schendt Engineering Corp. was the prime design consultant for this project. The plant has one 50MMBtuH generator (G-1) and three 100MMBtuH generators (G-2, 3, & 4). The plant HTHW distribution...

Lewis Palmer School District Admin Building Renovation

Lewis Palmer School District Admin Building Renovation Project generally involved renovation of a historic school building to serve as the school district administration building. This facility consisted of approximately 20,000SF of floor space on three levels. The...

HP Chilled Water Plant Expansion

HP Chilled Water Plant Expansion SEC was the prime design consultant on this project. This project consisted of expansion of the existing chilled water plant and construction of a new heating plant due to the split of Hewlett Packard into two companies and the need...

HP Central Chiller Plant Expansion

HP Central Chiller Plant Expansion Schendt Engineering Corp. Staff has a 18 year history working at this site. During this time period, we have renovated nearly all of the 500,000SF of space within this facility. During this tenure, we had as-built all of the existing...
(719) 637-8850